Showing posts with label Production staff. Show all posts
Showing posts with label Production staff. Show all posts

Friday, 17 February 2012

What we did for New Year

Startech were pleased to supply 3 weddings, in the week between Christmas and New Year, with technical support are area where our attention to detail can help create that special day.


The biggest of these was at Worton Farm near Witney, with our Technical Manager, Shanks, installing lighting both indoors and outdoors throughout the 2 marquees and grounds. As well as providing lighing for the ceremony and wedding breakfast, Shanks was also there to manage the power supply with 2 generators supplied by John F Hunt, an important role for any outdoor event, as well as run the lighting for the evening's band & disco.

Startech also installed lighting for a wedding at Conference Centre Oxford and a PA system in Sunningwell.

As well as the lighting the wedding at Conference Centre Oxford, Roy, our Managing Director also supported a New Years Eve party at the same venue across the two largest rooms. All this on top of our normal support to our regular clients over the festive period.

Wednesday, 28 September 2011

Oxonmoot returns

Last weekend saw the annual gathering in Oxford to celebrate the life and works of JRR Tolkien, and Startech were there to help.

One of the events during the weekend is a cabaret evening in the Dining Room at Lady Magaret Hall which Startech provided LED lighting for. In previous years the cabaret has been lit by more traditional fixtures, but that has meant laying 50 metres of 63 amp cable to get enough power in to the room. This year Startech worked closely with Mike Percival from Oxonmoot to provide almost a completely LED rig which could be powered from the existing supply in the room.

After the event Mike sent us the following:

Everything went very smoothly indeed. I think the bottom line is that we proved that in fact in a space that size it is perfectly possible to light an event of the nature of ours with 100% LED lights. I did use the source 4s
for two items - but one was laziness (the performer revealed at the last minute they wanted to use more of the acting area than they had told me when I plotted their lights, so it was easier to add in the source 4s than to
re-plot the LED profiles, but they would in fact have been better), and the other I only really included them because they were there!

Finally for now, please say a huge thank you to Chris and especially to Nigel for their help, without which our event wouldn't have gone as well as it did. 



Friday, 24 December 2010

Barcelona Conference

After taking serious precautions to ensure that the artic’ containing kit travelled safely and in good time to Barcelona through the snow, the day the crew were booked to fly was the day that the Spanish air traffic controllers chose to go on strike. With a day lost for the get in the crew worked for 12 hours immediately upon arrival and again for 17 hours the following day installing four 16’ x 9’ screens and 12k projectors, a 20’ x 24’ stage with dance floor, lighting and sound, and 8 x 3.2m LED curtain. The one and a half day conference was dramatically opened by a dance troop and went on to be delivered in variously styled stages such as game show, storyteller and news broadcast. 220 delegates enjoyed the seamless production of the information being delivered followed by a comparatively relaxed get out.